Urunga CBD - Detailed Design - Feedback Round 2

 

Design package 2_CBD.png

Download draft design -Package 2 

To view the full high-resolution design package, please download the file below: 

Urunga-CBD-Upgrade_Detailed-Design-Round-2_High-Resolution.pdf(PDF, 87MB)

Complete the survey here

Feedback Round Two

We are requesting feedback on the below elements to support meaningful development of the proposed designs for the Urunga CBD Upgrade.

The survey closes Sunday 26 July 2026. 

Elements 

  • Parking & Traffic Refinement (round one follow-up)
  • Landscape & Planting 
  • Street Furniture & Public Domain Elements
  • Shade & Shelter
  • Materials & Finishes
  • Lighting
  • Character and Feel

Tips for completing the survey

  • Be specific and provide context—how does your idea benefit the broader community?
  • Use the detailed designs and outlined categories to ensure your input is captured accurately.

Updates to the design from round one

The following areas of the design from round one have been updated following initial community feedback:

· Bonville Street (Between Bowra St and Bellingen St): Additional Parking and relocation of School Crossing

· Bonville Street Car Park: Minor layout improvements

· Morgo Street: Pedestrian crossing and parking alignment changes

· Library Open Space: Addition of new play space and layout improvements

· Minerva Lane (Rear of Library): Parking Improvements

· Bonville Street (south of Bowra St): Parking improvements

Parking

Feedback from the community has noted a desire to reduce parking loss where possible.

The current layout achieves 251 car spaces resulting from an initial 255, while still making room for improved streetscaping, pedestrian crossings and on street dining.

The designs also improve the location and layout of People with Disability (PWD) parking, provide additional caravan storage for Reflections check-in and seek to maximize parking at locations where it is most needed.

 

Frequently Asked Questions (FAQS)

Why is art not included as an element in feedback round 2?

The project will consider artwork and the best way to engage the community and local artists in the near future. To support necessary project timelines, we have focused on other elements included as part of this release and are confident that the artwork component of the project can be progressed after these elements are set.

Future community engagement will occur on any proposed art, and we will seek to engage local artists. 

 

Why is the full layout of street furniture and seating areas not shown in the designs?

To support meaningful feedback, indicative seating layouts have been provided which allow more constructive and targeted feedback on specific materials and styles of furniture. This feedback will then be used to develop the style applied across the project. 

 

Are maintenance and the long-term impact of vegetation being considered?

Yes. Long-term maintenance, asset life, safety and operational requirements are key considerations in the final landscape design. Plant species will be selected to suit local conditions, minimise maintenance requirements and avoid impacts on surrounding infrastructure, while supporting visibility, accessibility and community safety.

 

 

Will existing vegetation be removed as part of the project?

Some existing vegetation may need to be removed to accommodate the proposed improvements. Where this occurs, it will be carefully assessed and offset through new planting that contributes to the long-term landscape vision, improves amenity and supports a safer, more welcoming public environment.

 

 

Why are you asking about a theme or identity for Urunga?

As the CBD Upgrade evolves into detailed design, Council is exploring opportunities to create a stronger sense of place throughout the town centre. Community feedback on Urunga's unique identity will help inform future placemaking elements such as public art, wayfinding, seating, landscaping and interpretation, creating a more cohesive and welcoming experience for residents and visitors. This work will also help inform the next stage of the Safer Cities: Her Way 2 Program, which focuses on creating safer and more inclusive public spaces through thoughtful place-based design.

 

What is the Safer Cities: Her Way 2 program?

Council has recently secured $1 million through Transport for NSW's Safer Cities: Her Way 2 Program to improve perceptions of safety and create a more welcoming and inclusive Urunga town centre, particularly for women, girls and gender diverse people.

As part of this Program, Council will undertake a dedicated co-design process with women, girls and gender diverse people, together with local artists and community representatives, to help shape placemaking elements such as public art, seating, planting, wayfinding and other features that contribute to the character, identity and safety of the precinct.

 

 

View more FAQS and background information on the designs here